Repository Specific Guides
...
Link Enterprise for M365
Installation and Base Configur...
Installation Overview
2min
The below outlines the necessary Gimmal Link Enterprise installation tasks:
- Install Enterprise Connector
- Configure M365 application
- Install SAP transports (mandatory ECM, optional Content Server)
- Create SAP SAP system account with appropriate authorizations (mandatory ECM)
- Configure SAP RFC destinations and Gateway (ECM only)
- Configure SAP Gateway - ECM Only
- Base SAP ArchiveLink Configuration
- Base SAP Link Enterprise Configuration
- Base Enterprise Connector Configuration - SAP / ECM / Content Server / RFC Destination
- Milestone: Establish SAP <-> Enterprise Connector <-> SharePoint Connectivity
- Determine Viewing Strategy (located in Solution Guide)
Optional follow up steps (not required to achieve base the connectivity milestone) and notes include:
- Follow Up Basis Tasks
- Follow Up Security Tasks
- Follow Up Middleware Team Tasks
- Follow up SharePoint Team Tasks
For additional integration patterns (i.e.: document storage, inbound processing, metadata transfer, etc.…) this functional configuration is NOT included in this guide - refer to the Solution Guide.
Such activity includes:
- Configure SAP ArchiveLink document type and link tables
- Configure SharePoint collections, sites, libraries, and content types
- Configure Link Enterprise document storage, linking, migration, metadata transfer, etc.
- Customize or extend SCRUD functionality (ECM only)